Marriott Hotel
Marriott Hotel - Redmond, WA
The Redmond Marriot provided us with an opportunity to show off our hospitality capabilities. Completed in 2003, this job features a prototypical steel framed hotel. Steeler Slotted Studs were selected as a cost-effective alternative to slotted track, which saved the contractor time and money while still providing a formidable head-of-wall system. In the hotel industry, quality steel promotes quality stays.
Steeler Products Used:
COMPANY NEWS
Steel 101
Jul, 25 2016 � When Iron Ore mom loves Carbon dad very much and a little heat is applied, Steel is born. ... Read More »
Steel, An Upgrade
Jul, 18 2016 � Cold-formed steel may be your go-to framing system but you can upgrade to Steeler Inc.'s EQ Steel option, the Elite Framing System, the big brother to standard steel products. ... Read More »